Skip Ribbon Commands
Skip to main content

How to Find Us

Directions and Travel Information

Address:

CPS, Regal House, 4 Station Road, Marlow, SL7 1NZ.

When using Sat Nav, please use the post code SL7 1NG , which is for the building opposite.

From the M40 Junction 4

  • Leave the M40 at Junction 4 - High Wycombe.
  • Follow signs for the A404, Marlow and the M4.
  • Exit at the first junction off the A404 and turn right towards Marlow.
  • Continue along this road for approximately one mile.
  • You will pass an Esso petrol station on the right and go through a pedestrian crossing.
  • Continue on to the mini roundabout and go straight across into Spittal Street.
  • At the next mini roundabout, take the first left and travel the full length of the High Street.
  • At the mini roundabout at the bottom of the High Street, take the first left into Station Road.
  • Regal House has a gated entrance approximately 100m from the High Street.

From the M4 Junction 8/9

  • Leave the M4 at Junction 8/9 - Maidenhead.
  • Follow signs for the A404, High Wycombe and the M40.
  • Continue along the dual carriageway to the first roundabout.
  • Take the first exit onto the Marlow Road towards Marlow.
  • Continue along this road and cross over the bridge.
  • At the double mini roundabout: Take the second exit on first mini roundabout which leads onto the second. On the second mini roundabout, take the second exit onto Station Road.
  • Regal House has a gated entrance approximately 100m from the High Street.

Nearest Railway Station: Marlow

It is a 5 minute walk from the station to our Head Office.

Regal House has a gated entrance approximately 100m from the High Street.